IdExchange 1.9.1

Installation Approach

Objective

The goal is to describe the installation overall process so the teams can prepare and have the components in place ensure a streamlined and successful installation. The phases are:

Approach

Planning: We will discuss what is needed and what to expect for the installation. The goal is to ensure all personnel are on standby and the systems are prepared.

Test Installation: Via WebEx, we will assist with the installation in the test/development environment. This will provide a 

Production installation: After conducting a site readiness review, we will assist with the installation in the production onsite.

Training: After the systems have been installed, we will perform training for credentialing activities and system administration fuctions

Support: We will describe the process to obtain assistance once the system is operational. 

Planning

Action Items

Preparation assistance: Architecture and permissions review. We perform an assessment of the infrastructure to help ensure all the necessary perquisites are in place.

Test installation: We will schedule a time to perform the installation in the development environment

Onsite preparation: We will verify the perquisites are in place and the production environment is ready

Onsite installation: The system will be installed in production and credentials will be issued.

Training: We will perform training for issuance, updates, post issuance updates and system management.